Adam W

Well-Known Member
First Name
Adam
Joined
Apr 26, 2025
Threads
12
Messages
430
Reaction score
1,387
Location
Washington
Vehicles
Honda CRV
Slate Accelerates Toward Full-Scale Electric Truck Manufacturing
https://www.newsweek.com/slate-accelerates-toward-full-scale-electric-truck-manufacturing-12149591

Slate Auto Pickup Truck Current state of the Warsaw manufacturing assembly plant (by Barman in Newsweek article) Slate-Warsaw-Manufacturing.png



Newsweek interviewed Chris Barman, who gives detailed milestone timelines for the remaining pieces of the manufacturig plant to come online.

Highlights as of July 2026:
  • Body shop is fully complete and operational
  • E-coating area is 70% installed, will be complete by end of summer
  • They're building a trestle to move vehicles from the west building to the East, completion end of summer. It's not real clear what activities take place in the east building.
  • General Assembly area nearly complete with four lines
  • Seat line starts installation in a week or two.
  • Wheel and tire operations in place by end of summer
 

tubes

Well-Known Member
First Name
Tubes
Joined
Jun 6, 2026
Threads
8
Messages
572
Reaction score
1,126
Location
NC
Vehicles
Honda Odyssey, Subaru Legacy
"End of Summer" seems to be the mantra. So, September 20.

Some talk of welds by both Barman and the writer, that is, get those welds right. Ultrasonic inspections, measurements, etc. This may explain the welds seen on the body-in-white in some of the demos. Probably hand made and not indicative of the final outcome.
 

Frozen North

Well-Known Member
First Name
Chris
Joined
Jul 6, 2026
Threads
1
Messages
65
Reaction score
122
Location
ND
Vehicles
Rav4, Ridgeline, Impreza, 528i, Yaris, Grand Cherokee, X5
Slate Accelerates Toward Full-Scale Electric Truck Manufacturing
https://www.newsweek.com/slate-accelerates-toward-full-scale-electric-truck-manufacturing-12149591

Slate-Warsaw-Manufacturing.png.webp



Newsweek interviewed Chris Barman, who gives detailed milestone timelines for the remaining pieces of the manufacturig plant to come online.

Highlights as of July 2026:
  • Body shop is fully complete and operational
  • E-coating area is 70% installed, will be complete by end of summer
  • They're building a trestle to move vehicles from the west building to the East, completion end of summer. It's not real clear what activities take place in the east building.
  • General Assembly area nearly complete with four lines
  • Seat line starts installation in a week or two.
  • Wheel and tire operations in place by end of summer
Good read, thanks for posting that for us hungry Slate information devourerers.
 

Shrink36s

Well-Known Member
Joined
Apr 16, 2026
Threads
1
Messages
256
Reaction score
479
Location
Michigan
Vehicles
'18 Equinox
The General Assembly area of the plant is nearly ready with all four lines of trim in place. “We're doing a lot of the building of the structure where it's needed around [those lines], ...
The four lines of trim is interesting. Does that mean Blank, Square SUV, Fastback SUV, Open Air or maybe Cargo?
Maybe this is just 4 lines that put on/build out 4 different areas of trim across the one sku?
 

fxrdr31

Active Member
First Name
Andrew
Joined
Jun 18, 2026
Threads
1
Messages
35
Reaction score
64
Location
Wayne, MI, United States
Vehicles
Ford F150
The four lines of trim is interesting. Does that mean Blank, Square SUV, Fastback SUV, Open Air or maybe Cargo?
Maybe this is just 4 lines that put on/build out 4 different areas of trim across the one sku?
They probably all build the base slate but might just install different things on each line. It is still 1 continuous line but zig zags back and forth and each time it's called a new trim line at least that is how a traditional Assembly line is from what I see
 

CALLIGRA

New Member
First Name
Ada
Joined
Jun 24, 2026
Threads
0
Messages
4
Reaction score
4
Location
Los Angeles
Vehicles
Ioniq 6
The four lines of trim is interesting. Does that mean Blank, Square SUV, Fastback SUV, Open Air or maybe Cargo?
Maybe this is just 4 lines that put on/build out 4 different areas of trim across the one sku?
Unlikely, 4 lines of GA includes stuff like installing brakes, wiring harnesses, dampers, windshields, etc.

If they do build other spec vehicles on the line it will be done by kitting different parts to the line whilst using the same line

Having said that; what is sounding far more likely is that the production line will be building 1 base spec vehicle with an EOL (end of line) team bolting on the add on parts after GA

the EOL area is possibly what we see in this section of the "a new day in Warsaw" having said that this could also be a training area for new assembly or service techs

Slate Auto Pickup Truck Current state of the Warsaw manufacturing assembly plant (by Barman in Newsweek article) Screenshot_20260710-095523
 

E90400K

Well-Known Member
First Name
Francis
Joined
Apr 26, 2025
Threads
9
Messages
1,641
Reaction score
1,721
Location
Under a Bridge in the Middle of the Mid Atlantic
Vehicles
A Ford truck
I still don't understand why Slate is building its own seats.
 

Tom Sawyer

Well-Known Member
Joined
Jan 11, 2026
Threads
1
Messages
687
Reaction score
817
Location
Northeast Ohio
Vehicles
CJ-7
I sat in a demonstrator last summer and found those seats very comfortable. Those seats didn't have the prominent side bolsters, and I personally prefer the previous version.
 
 
Top